Stacker Reclaimer Upgrade Cost

Case Studies

Oracle Supplied 8 new 6 pole AC induction motors and a backplate housing a Parker 650V AC drive unit to control the long travel of the stacker Reclaimer.

The installation was completed by the clients own engineering team to keep costs down. Oracle Then commissioned and tested the whole system.

This machine scoops up coke using a rotating bucket as it travels down the linear tracks.

It also stacks up the coke by offloading coal from a conveyor to stockpile the material.

This is the 5th upgrade of its type carried out in recent years.

Before and After